Standards preparation checklist
Water and Wastewater Remote Access Review
Review selected decisions and controls for remote access using the guide's sector specific considerations and product agnostic architectures.
Baseline: NIST SP 1800-45, final, June 2026. Prepared November 1, 2026.

Has the utility decided which functions should be remotely accessible?
Separate remote alarming, remote observation and two way process control. Each remote connection is weighed for its effect on safety related functions. The decision belongs with the utility and its engineering/safety owners.
Evidence to gather
Approved use cases, process/safety review and functions kept on site.
To complete the record
Review the operational need and alternatives before selecting remote access technology.
Topic reference: NIST SP 1800-45; Section 3.1; PDF page 15.
Answer:
Owner, evidence reference and follow up date:
Can you distinguish human access from process to process links?
An engineer logging in and a pumping station communicating through a provider network need different controls. Inventory both kinds of connection and the assets reached through each.
Evidence to gather
Interactive access inventory, telemetry/process links and external providers.
To complete the record
Identify unmanaged connections and assign a responsible owner to each.
Topic reference: NIST SP 1800-45; Section 3 and section 2.3; PDF page 15.
Answer:
Owner, evidence reference and follow up date:
Are remote identities and permissions controlled?
Confirm who is allowed to reach which assets and for what purpose. Include employee, integrator and vendor accounts, how access is granted and how it is removed.
Evidence to gather
Identity/role register, approval records, permitted targets and revocation process.
To complete the record
Reconcile active users with the authorized operational roles.
Topic reference: NIST SP 1800-45; Section 3.3, Table 3; PDF page 17.
Answer:
Owner, evidence reference and follow up date:
Is MFA applied to the remote access service?
Review the remote user's authentication path, default credentials and exceptions. Authentication at a suitable gateway protects access to legacy controllers as well as to devices that implement MFA directly.
Evidence to gather
Access service settings, MFA coverage, identity design and documented exceptions.
To complete the record
Have the architecture owner address each gap through a tested design that suits the control equipment.
Topic reference: NIST SP 1800-45; Section 3.3, Table 3; PDF page 17.
Answer:
Owner, evidence reference and follow up date:
Is traffic over externally managed infrastructure protected?
Identify where the utility relies on an internet, telecom or other outside network. Confirm how confidentiality and integrity are protected across that path and who maintains the protective service.
Evidence to gather
Connection diagrams, encryption configuration and provider responsibilities.
To complete the record
Identify each path that needs protection and have engineering agree on a suitable treatment.
Topic reference: NIST SP 1800-45; Section 3.3, Table 3; PDF page 16.
Answer:
Owner, evidence reference and follow up date:
Does the connection terminate at a controlled boundary?
Each remote user reaches the process network through a controlled path. The traditional example terminates a session in a DMZ and uses a separately controlled connection onward. Other designs need equivalent, justified controls for their use case.
Evidence to gather
Architecture, remote access targets and boundary/traffic-control configurations.
To complete the record
Review actual access paths against the approved design before changing rules.
Topic reference: NIST SP 1800-45; Sections 3.3 and 4.1; PDF page 19.
Answer:
Owner, evidence reference and follow up date:
Are access windows and session removal defined?
Identify whether access is temporary or continuous and why. Define expiry, revocation and the process for confirming that access closes when a service visit is complete.
Evidence to gather
Session/access approvals, expiration settings and completed work revocation records.
To complete the record
Review persistent vendor access with the utility owner and supplier.
Topic reference: NIST SP 1800-45; Section 3.3, Table 3; PDF page 18.
Answer:
Owner, evidence reference and follow up date:
Can the utility identify and safely disable an unwanted connection?
Know which equipment and service to contact or disconnect. The response accounts for the process impact of removing a link, and an approved isolation procedure builds on the labels.
Evidence to gather
Connection inventory, labels, incident procedure and engineering authority.
To complete the record
Agree on the safe response and escalation before the connection is needed in an emergency.
Topic reference: NIST SP 1800-45; Section 3.3, Table 3; PDF page 17.
Answer:
Owner, evidence reference and follow up date:
Are remote activities logged and available for review?
Confirm what the access service and boundary devices actually record, where logs are retained and who can use them. Separate a successful login record from evidence of the actions performed afterward.
Evidence to gather
Representative access/activity logs, retention and access controls.
To complete the record
Document current logging coverage and agree on feasible additions at the appropriate access layer.
Topic reference: NIST SP 1800-45; Sections 3.3 and 4.1; PDF page 17.
Answer:
Owner, evidence reference and follow up date:
Are remote endpoints and file transfer paths protected?
The device used by a vendor or employee is part of the access path. Review endpoint protection and any controlled file upload route, including how files are checked before reaching OT assets.
Evidence to gather
Endpoint requirements, vendor arrangements and file transfer controls.
To complete the record
Agree supported endpoint and transfer practices with the utility and access provider.
Topic reference: NIST SP 1800-45; Section 3.3; section 4.1; PDF page 20.
Answer:
Owner, evidence reference and follow up date:
Are maintenance and updates coordinated with operations?
Keep remote service software and hardware under change and vulnerability management. Operations should know about remote activity so authorized work can be distinguished from an unexpected event.
Evidence to gather
Maintenance schedule, advisories, change approvals and operator notifications.
To complete the record
Agree on testing and a safe change window for each update.
Topic reference: NIST SP 1800-45; Section 3.3, Table 3; PDF page 18.
Answer:
Owner, evidence reference and follow up date:
Do supplier agreements explain security and operational responsibilities?
For vendor or cloud managed access, identify who administers identities, monitors service, responds to an incident and supports recovery. A service contract should make the handoffs understandable to the utility.
Evidence to gather
Contract/SLA, responsibility assignments, escalation contacts and access conditions.
To complete the record
Clarify each responsibility, then extend or renew the access arrangement.
Topic reference: NIST SP 1800-45; Section 3.3; section 4.2; PDF page 20.
Answer:
Owner, evidence reference and follow up date:
Do permissions and network rules limit access to what is needed?
Review targets, ports, protocols and directions against actual operational requirements. Keep necessary process communication separate from broad administrative access.
Evidence to gather
Approved flow list, access rules and rationale for exceptions.
To complete the record
Ask the process and architecture owners to confirm the purpose of each permission and remove any that are surplus.
Topic reference: NIST SP 1800-45; Section 3.3, Table 3; PDF page 18.
Answer:
Owner, evidence reference and follow up date:
Is the chosen architecture supportable by this utility?
Consider staffing, distributed sites, provider dependencies and the effort to operate the safeguards. NIST's examples illustrate options.
Evidence to gather
Architecture decision, staffing/support plan, dependencies and recovery assumptions.
To complete the record
Review the selected design against the utility's capacity and engineering requirements.
Topic reference: NIST SP 1800-45; Sections 2.2 and 4.1-4.3; PDF page 12.
Answer:
Owner, evidence reference and follow up date: