Planning scope and research basis
This manual is built for a controlled assessment of treatment, disinfection, pumping, storage, distribution, collection and effluent control at systems in the United States. It carries the federal drinking water and wastewater research; the companion volume screens all fifty states so you can resolve the state cybersecurity statutes, permit conditions and local ownership questions that decide what your system actually owes.
What the assessment produces
An approved scope, an applicability register, a process dependency map, examined evidence, safe activity records, consequence based findings, a corrective plan and a verification record. The workbook and the fillable worksheets carry the work from planning through handover, and the applicability register begins with the PWSID, the permit and the population served because every later duty is counted from them.
Sources current to November 3, 2026
Current public primary sources, official program material and selected peer reviewed research support the text. Effective instruments take precedence over guidance and over this manual. The licensed ISA/IEC 62443 parts, operator security directives, facility permits and private contracts are held by the organization itself, so the utility's own permits, certification receipts and state correspondence are the first records the assessment requests.
Open applicability
The source register sorts binding instruments, guidance, drafts, superseded versions and open questions into their own entries. Each open entry names the controlling text and the facility facts to gather, and the site specific conclusion is signed once they are in the record.
Adoption and review
Complete the facility specific records and obtain the named operating, technical and compliance approvals. The questions that confirm a date, threshold or clause for your facility are summarized in OT questions to settle before field work.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), NIST SP 800-82 Rev. 4 initial public draft, Guide to Operational Technology (OT) Security (F02), A survey of cyber security management in industrial control systems (R01), Threat modeling of industrial control systems: A systematic literature review (R02), ICSSIM: A framework for building industrial control systems security testbeds (R03)
Tell a senior examiner the PWSID, the population served and the remote sites, and the first scoping conversation will sort out which records the register needs.
Indiana and Maryland Water Thresholds
Indiana and Maryland count their water cybersecurity duties differently, and a utility in either state sets its calendar from these thresholds.
Indiana and Maryland
For Indiana, IDEM currently identifies an annual vulnerability assessment, certification by December 31 2026 and every other year thereafter, and annual reporter designation before September 1. The Indiana row is signed once the current IC 13-18-16.5 text, the approved tools, the actual scope and the independent incident triggers are confirmed. For Maryland, the current Environment 9-2705 applies to community water and sewerage systems serving over 3,300 customers, with a maturity assessment by July 1 2026 and every two years. Record the all system contact, training and reporting duties and the state office collection dates in their own rows, apart from the operator's own filing duties. The May 2026 MDE guidance supplies submission instructions, but its Attachment 2 counts people where the statute counts customers.
Preparation workflow
Use the Assessment prep worksheet and its CSV to prepare audits, cyber and physical assessments and penetration tests. Gather the permissions, the third party authority, the OT safety restrictions, the stop and recovery arrangements and the existing evidence first, and then agree the method. Use the State research checklist, one row per state and sector, to assign further state and sector research alongside the local, operator, permit and client facts.
Evidence and implementation
The May 2026 MDE guidance now describes secure MoveIT submission. Its Attachment 2 uses people rather than statutory customers. Record the conflict in the applicability register, confirm current account eligibility and filing instructions with the agency, and close the row with the agency's own answer.
Sources: IDEM Cybersecurity for Water and Wastewater Facilities (W04), Maryland Environment 9-2705, current selected codified text (W05), MDE SB871 implementation guidance, May 2026 (W06)
Applying the Updated Audit Workbook
The workbook works as an execution record rather than a checklist. Every procedure row now carries the fields an auditor will read first: the exact criterion tested, the population it was tested against, the period, the sampling rationale, the permitted method, the execution date, the actual observation, the evidence identifiers and the reviewer. A row with those fields filled is a result, a row still being filled is a plan, and the workbook keeps the two visibly apart.
Pre Execution Readiness Checklist
Fill the criterion, population, period and sampling rationale first, ahead of any system work, because those four fields give the eventual observation its meaning. Record the permitted method exactly as the activity permit states it. When the work is done, enter the execution date, what was actually observed and the evidence identifiers that support it, then hand the row to the named reviewer. Keep the source register and the operating authority record apart from the procedure rows, so permit and rule citations stay distinct from the operators' approvals.
Pending Scope and Governance Decisions
The open count on the Start sheet counts blank decisions, decision text that needs correcting and resolved selections that need a required record field. Treat Fields present as the prompt for qualified review, which is the step that completes the row. The responsible operating, technical and compliance people sign the approval fields once they have reviewed the work, and those signatures are what mark a workbook as reviewed rather than simply filled.
Engagement Scope and Authorization
Record every proposed exclusion, its reason and the responsible reviewer in Scope decisions so deferred work stays visible to the sponsor. The State research sheet is a separately labelled routing register: its state and sector rows are a client research checklist, and a row becomes a facility conclusion when the controlling instrument is recorded beside it. For New York work use the Clause matrix and questions Q01 to Q10 in the New York set. Current instruments and local facts that are still being gathered carry the Unresolved status, which clears when someone retrieves the text or establishes the fact.
Source Access and Revision History
The Sources sheet lists each source with the date it was reviewed. Request the current text of each source as you come to it, and keep the duty on the register while the text arrives. Use the Edition record to track your own revisions and reviews, and keep the previous version when you adopt a new one.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), NIST SP 800-115, Technical Guide to Information Security Testing and Assessment (F03)
Using this planning pack
Use this pack in the order a utility makes decisions. Fix the legal and operating boundary first, because the PWSID, the population served, the permit and the ownership of each remote site decide which duties attach to treatment, disinfection, pumping, storage, distribution, collection and effluent control. Choose evidence and methods once the operators responsible for the process have agreed what may be examined, so the assessment works alongside safe water operations.
First use
Read the sector applicability pages, then the State and local applicability companion. Create one record for each legal entity, facility and regulatory program. The workbook's state and sector rows form a client research checklist, with a separate register of fifty state starting sources; a row becomes a facility determination when the operator records the instrument and the decision. Appoint a sponsor, an operating owner, a technical lead, a compliance owner and a project manager. Complete the site worksheet. Resolve the mandatory instruments and the operating permissions first, then schedule any intrusive work, and use the field authorization sheet for each approved activity.
Reading the evidence
The pack separates binding law or an incorporated instrument, agency guidance, standards and proposed assessment procedures. A citation identifies the source for a regulatory statement. A procedure description explains how the assessment team can collect evidence, and the legal obligations themselves come from the cited instruments. A rule can be effective while a particular requirement has a later compliance date, and an approved standard can reach enforcement at a later date. Record both dates and the applicable version, and take each deadline from the instrument's effective date.
Signing an assessment conclusion
The reviewer signs against the actual facility facts, the current instruments, the examined evidence, the test permissions and the open questions recorded with them. Preparing this pack readies the facility, and the assessment itself is the examination that follows. A named technical reviewer reviews the completed work, and the organization then adopts or publishes its conclusions.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), NIST SP 800-115, Technical Guide to Information Security Testing and Assessment (F03)
Agreement with the operators on what may be examined comes first, ahead of any method; (800) 868-8189 reaches examiners who hold that conversation with operations first.
Decisions before mobilization
Distinguish community drinking water systems, noncommunity water systems, publicly owned treatment works, private wastewater facilities and industrial dischargers as the first step, ahead of any checklist, because each carries different federal and state duties. Record population served, service connections and customers as three separate quantities with their own evidence, since different states measure coverage with different units, and keeping each figure distinct lets the utility state its own applicability accurately.
Define the work product
Decide in writing whether the engagement is an engineering risk assessment, a gap assessment against named requirements, independent assurance, or a combination with the responsibilities separated. The decision changes the evidence standard, the sampling and the words the report may use. Name the intended recipients and who may receive the technical appendices. If the assessment team or its firm designed, installed or operates any of the controls in scope, disclose that relationship at the outset, so any description of the work as independent sits beside a recorded disclosure.
Record the facility boundary
Identify PLCs and RTUs, SCADA servers, HMIs, engineering stations, dosing controllers, telemetry, remote pump stations, laboratory interfaces and vendor connections. Include the identity, DNS, time, virtualization, telecommunications and backup dependencies whose failure could affect the process, because the record follows the process past the controller to the services that can actually take it down. Identify shared corporate services and third party interfaces explicitly, and record test permission for each as its own decision, so the scope names them and the permit governs them. For each legal entity record the physical address, owner, operator, sector, production or service function, permits, regulators, contracts, insurer conditions and public body status. For distributed assets list every other state, local authority and control center involved.
Record each exclusion and its effect
Document every excluded safety system, vendor appliance outside reach, firmware past vendor support, protocol outside the approval and record held elsewhere, and state in one sentence how each exclusion shapes the conclusion. An excluded critical dependency stays in the report as a visible item the sponsor accepted. Fixing the asset count at the start keeps the scope matched to the process rather than to convenience.
Release decision
The sponsor approves purpose and resources. The operating owner approves the process boundary. The compliance owner signs the applicability register. The technical lead signs the method. The project manager records the dependencies and the open items. Each signature is dated and kept with the scope record, and approval is that signed, dated entry itself.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), NIST SP 800-115, Technical Guide to Information Security Testing and Assessment (F03)
Roles and decision authority
Assign people and alternates before work starts, and record them where the field team can find them during an outage. Small organizations may combine roles, and three authorities stay explicit at every team size: who authorizes operating activity, who reviews evidence, and who accepts residual risk.
| Role | Decision or work owned |
|---|---|
| Sponsor or CISO | Approves the business objective, the resources and the reporting audience. Accepts residual business risk within delegated authority and records that acceptance in writing. |
| Operating owner and engineering authority | Approve process boundaries, safe state and production methods. Water operations determine safe treatment, pressure, chemical dosing and discharge conditions. Setpoints, dosing rates, alarm limits and controller modes remain under operations control throughout the assessment. |
| Compliance and legal owners | Resolve the applicable instruments, disclosure restrictions and incident reporting duties. Identify the responsible filing official and an alternate who acts in the official's absence. |
| Technical lead and field technician | Design the permitted method and collect traceable evidence. A technician works to the permitted target list and tool settings, and an active test goes ahead on the written authorization of the people named in the permit. |
| Project manager | Sequences work, tracks evidence and approvals, protects operating windows, manages changes and closes acceptance records. Owns the open items register. |
| Evidence custodian and quality reviewer | Control evidence access, integrity, retention and the independent review of facts and conclusions. Record conflicts of interest and review exceptions. |
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), NIST SP 800-115, Technical Guide to Information Security Testing and Assessment (F03)
Project stages and acceptance
Plan by completed decisions and evidence rather than by a fixed number of days. Populate durations and staffing once site access, document availability and maintenance windows are known, and treat each stage's exit evidence as the gate for the next one.
| Stage | Required exit evidence |
|---|---|
| 1 Applicability and scope | Signed facility register, controlling instruments, exclusions and reporting scope. Every open legal question has an owner and a stated effect on the engagement. |
| 2 Readiness | Approved evidence request, interview schedule, collection method, secure workspace, current backup evidence and operating contacts with alternates. |
| 3 Examination | Asset and process records, reconciled diagrams, sampled control evidence and a dated account of what was examined and what was held outside the examination. |
| 4 Authorized validation | Activity permits, baseline observations, test log, stop and recovery record and post work operating acceptance. The record states whether validation was authorized and the reason for that decision. |
| 5 Reporting and decisions | Reviewed findings, requirement mappings, stated boundaries, corrective owners, funding decisions and a residual risk record signed by the person entitled to accept it. |
| 6 Verification and handover | Retest evidence, recurring review schedule, retained records, lessons and a signed handover. A recommendation closes when it is verified or formally dispositioned. |
Sources: NIST SP 800-115, Technical Guide to Information Security Testing and Assessment (F03)
Applicability and obligation records
Use one row per obligation. A single facility can carry several reporting clocks, several evidence packages and several responsible officials for the same event, and one row per obligation keeps every deadline in view.
Make a defensible decision
For each candidate instrument record the issuing authority, the legal citation, the adopted version, the effective date, the compliance date, the regulated entity, the covered system, the trigger and the exceptions. Link the controlled copy of the source and the evidence that establishes the facility facts the decision turns on. Mark the site decision Applicable, Not applicable with reason, or Unresolved.
Separate obligation types
Federal requirements, state utility orders, public agency standards, local permits and contracts overlap on the same equipment. Use the fifty state companion to select additional checks, and confirm municipal, county, tribal or territorial authority where it is relevant. Municipal ownership can change utility jurisdiction and public entity duties, and a federal obligation that independently applies stays on the register alongside them.
Preserve the reasoning
The compliance owner signs the decision date and the next review trigger. Save the instrument and its source URL in controlled records and name the person who will watch for amendments. For an incident clock record the trigger event, the start timestamp with its time zone, the deadline rule, the recipient, the permitted channel, the responsible official and the receipt. The auditor's first question about any applicability decision is why it was made and by whom, and this record is where that answer lives.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), CIRCIA public rulemaking notice (F05), Cybersecurity Resource Center (F09)
Federal drinking water obligations
AWIA Section 2013 amended SDWA Section 1433. Its RRA and ERP duties apply to community drinking water systems serving more than 3,300 people. Wastewater systems are screened under their own state and permit instruments, and the first entry in the water applicability register is the population figure and the evidence behind it.
Scope and content
Record each PWSID, its community system status and its population served. The complete RRA extends well beyond cyber risk and includes physical systems, monitoring, financial infrastructure, chemicals and operation and maintenance. Map the cyber evidence into the complete RRA as one contribution to the statutory assessment; a regulator reviewing the certification will look for the whole document.
Certification sequence
The second cycle RRA dates were March 31 2025 for systems serving 100,000 or more, December 31 2025 for 50,000 to 99,999, and June 30 2026 for 3,301 to 49,999. Confirm the actual certification receipt rather than the intended date. ERP certification is due within six months of the actual RRA certification, which can fall earlier than the cohort maximum. EPA lists December 31 2026 as the latest ERP date for the 3,301 to 49,999 cohort when the RRA was certified at its final due date. Where a receipt is missing, reconcile it now against the actual RRA certification, which remains the date the six month ERP period runs from. The subsequent five year review and certification duties need their own calendar rows.
Evidence and filing
Retain the completed RRA, the ERP, the cyber contribution, the approved revisions, the certification statements and the acknowledgments. EPA instructs utilities to submit certifications rather than the plans themselves and to keep the plans securely for at least five years, so the controlled record holds both the plan and the proof of submission. Coordinate with the local emergency planning committee to the extent possible, as the program requires.
Sources: AWIA Section 2013 and SDWA Section 1433 (W01), Certification of Risk and Resilience Assessments and Emergency Response Plans (W02)
Wastewater and discharge obligations
Treat wastewater facilities as their own regulated population. State law and the facility permit can impose cyber duties on their own authority, independently of AWIA, and the permit is the instrument the assessment reads first.
Establish the permit boundary
Record the NPDES or state permit, the publicly owned treatment works status, the outfalls, the collection systems, the remote pump sites, the industrial pretreatment obligations and the emergency conditions. Identify which owner or operator is responsible for reporting a malfunction, a bypass, a release or a loss of treatment capability, and record that person's name against each permit condition.
Connect cyber events to physical reporting
An unauthorized account event and a sewer overflow trigger different reporting duties, and a single incident can trigger both. Evaluate the cyber event and the process consequence on separate clocks. Obtain the current permit and the state instructions for notification timing, channel and follow up. The permit clock runs from awareness, and attribution follows on its own timeline.
New York example
DEC identifies initial reporting by SPDES permittees as soon as possible and no later than 24 hours after awareness, plus a second report within 30 days. Its adopted 2026 rules distinguish those incident duties from the POTW emergency planning, training, access, network and vulnerability requirements. The compendium identifies March 11 2027 for the specified POTW requirements and March 28 2027 for the initial annual certification.
Operational evidence
Trace the collection and treatment alarms, the telemetry dependencies, the pump controls, the disinfection and the effluent monitoring. Examine how personnel detect loss of visibility, verify actual conditions, contact the permit authority and maintain an approved safe operating response, and ask for the last occasion on which they did so. EPA's wastewater ERP template is useful voluntary guidance, and SDWA 1433 certification remains a drinking water duty.
Sources: Emergency Response Plan Templates for Drinking Water and Wastewater (W03), NYSDEC wastewater cybersecurity resources (W10), Wastewater cybersecurity regulations compendium (W11)
State water requirements that change the plan
Use the fifty state companion for every facility. The examples below each use a different population unit and a different schedule, and the planning action names the record that settles applicability.
| State and source | Planning action |
|---|---|
| Indiana W04 | Screen covered computerized or SCADA facilities, including the specified community water and wastewater categories. Verify the 500 person water threshold. Separate the annual assessment by December 31 from 2026, the certification every other year from December 31 2026, and the annual August 31 reporter designation. |
| Maryland W05 W06 | Use more than 3,300 customers under Environment 9-2705 for the enhanced scope. Confirm the July 1 2026 maturity assessment and the two year cycle. Reconcile the agency's certification collection with the actual operator submission instructions. |
| New Jersey W07 W08 | Use more than 500 service connections for WQAA scope. Check the annual controls assessment and certification, the framework updates and the incident obligations. Confirm any separate BPU order and the broader incident reporting law. |
| New York W09 W10 W11 | Separate DOH drinking water applicability from DEC SPDES and POTW duties. Appendix 5-E has a January 1 2027 transition with immediate training and reporting exceptions. Sign the site mapping against the full DOH rule text. |
| Missouri S25 and New Hampshire S29 NH-WW | Evaluate the statutory Internet connected control exemptions and the other stated exceptions. |
Sources: IDEM Cybersecurity for Water and Wastewater Facilities (W04), Maryland Environment 9-2705, current selected codified text (W05), MDE SB871 implementation guidance, May 2026 (W06), NJDEP Water Quality Accountability Act (W07), Water cybersecurity amendments (W08), New York drinking water cybersecurity applicability (W09), NYSDEC wastewater cybersecurity resources (W10), Wastewater cybersecurity regulations compendium (W11), RSMo 640.142 (S25), N.H. RSA 485:3-e (S29), NH-WW Wastewater cybersecurity protection program
Water process examination
Build separate evidence paths for safe treatment, distribution continuity and wastewater consequences. Each path starts at the physical measurement the operator trusts and works back to the controller and the network that could alter it.
Treatment and dosing
Identify how approved chemical setpoints, recipes and control logic are established, changed, checked and restored, and request the controller project files with their change history. Examine the access approvals and the change evidence. Ask operations how an incorrect value would be detected by independent measurement or operator checks, and record the answer with the instrument that provides the independent reading.
Remote pumping and telemetry
Record the communications ownership, the remote asset access, the loss of communications behavior, the operator alarms, the local operating capability and the physical access at each remote site. Ask for one representative current communication loss or recovery record; most utilities hold one, and the examiner reads it for how the site actually responded. Any live interruption or controller failover requires a separately approved operating test.
Laboratory and reporting interfaces
Trace the data used to make treatment, public health and discharge decisions from the instrument to the report. Review access, time integrity, retained records and the exceptions used when data is unavailable or unreliable. Establish who can validate field measurements and who can authorize public or regulatory communication.
Evidence accepted
The operator validates the process diagram and the credible consequence scenarios. Link each weakness to the affected service and its safeguards. Where process interlocks, manual operation or alarm effectiveness were described in interviews, the finding records them as described, and it records as demonstrated only what was shown, in those words.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), AWIA Section 2013 and SDWA Section 1433 (W01), Emergency Response Plan Templates for Drinking Water and Wastewater (W03)
Water incident and continuity exercise
Use an exercise to test decisions and records while the live process runs untouched. The following scenario is fictional, and it is built around the vendor account and the remote site that most utilities monitor least.
Scenario
A vendor account is suspected of unauthorized access to a remote pumping environment. Telemetry values are inconsistent, and the operators are still confirming the actual process condition. An operator also reports a communications alarm.
Controller prompts
Ask the operating lead to establish the safe response and the independent condition checks. Ask the technical team to identify the access path, the relevant records and the time offset between the vendor platform and the SCADA historian. Ask the compliance owner to determine whether state cyber reporting, a permit report, a public health notification or a contract notice is triggered, and on what clock.
Test the decisions
Record the first awareness timestamp, the event classifications, the alternate communications, the credentials held securely, the supplier reachability and the authority to change remote access. Test whether the team can locate the current ERP and the actual regulator contacts while normal corporate systems are down, because an ERP kept in a copy the team can reach during an outage is the one that serves the incident it was written for.
Acceptance and correction
The observer records the decisions, the supporting evidence, elapsed times where they were measured, the contacts to add and the assumptions to correct. Assign an owner to every open issue. A tabletop result demonstrates the decision process, and the plant restore and the regulator's acceptance are each confirmed by their own records.
Sources: NIST SP 800-61 Rev. 3, Incident Response Recommendations and Considerations for Cybersecurity Risk Management (F04), Emergency Response Plan Templates for Drinking Water and Wastewater (W03), NYSDEC wastewater cybersecurity resources (W10)
Water reporting and recurring calendar
Populate the calendar from signed applicability decisions and actual prior completion records rather than from intended dates. Each row names the trigger and the evidence that records the duty was met.
| Record | Trigger and evidence |
|---|---|
| AWIA RRA and ERP | Track each PWSID, its population cohort, the actual certification dates, the ERP dependency and the five year review cycle. Retain acknowledgments and the current plans. |
| State program | Record the applicable annual or two year assessment, certification, training and framework update duties separately. |
| Operational event | Use the current permit and the state definition for treatment failure, loss of safe service, bypass, overflow or discharge. Record the separate initial and written follow up clocks. |
| Cyber incident | For applicable Indiana facilities, IDEM identifies 24 hours after discovery when operations are affected and two business days when they are not. Check the current reporting instructions and any concurrent public entity duties. |
| Physical and organizational change | Review whether the change triggers a new analysis, a plan revision, a regulator notice or a recertification. Keep the change decision and the source that establishes the trigger together. |
Sources: AWIA Section 2013 and SDWA Section 1433 (W01), Certification of Risk and Resilience Assessments and Emergency Response Plans (W02), IDEM Cybersecurity for Water and Wastewater Facilities (W04), Maryland Environment 9-2705, current selected codified text (W05), MDE SB871 implementation guidance, May 2026 (W06), Water cybersecurity amendments (W08), New York drinking water cybersecurity applicability (W09), NYSDEC wastewater cybersecurity resources (W10)
Document requests and interviews
Request existing records first, ahead of any proposal for a live connection. Most of what a competent OT assessment needs already exists in engineering, maintenance and identity systems, and asking for it first tells you how well the operator knows its own process before a single packet is observed.
Initial evidence request
Request the asset inventory, the approved network and process drawings, the process description, current configuration exports, the remote access arrangements, the account owner list, maintenance records, the backup inventory and the most recent restoration evidence. Include PLCs and RTUs, SCADA servers, HMIs, engineering stations, dosing controllers, telemetry, remote pump stations, laboratory interfaces and vendor connections. Ask for the applicable regulatory assessments, prior findings and the change history for the period in scope. Give each request an identifier, a purpose, an expected owner, a time period, a format and a due date, and allow a supervised on site review for any record that stays at the facility. Record each item still outstanding together with its effect on the conclusion.
Interviews that test the record
Ask operations what happens when visibility, remote control, communications or a critical vendor service is lost, and listen for whether the answer names a procedure or a person. Ask engineering which installed details differ from the drawing; there usually are some, and the honest list is the most useful document the assessment will receive. Ask the identity owner how vendor access is approved and revoked and request the last revocation as evidence. Ask the recovery owner for the record of the last actual restore rather than a description of the backup product.
Sampling
Define the control population and the sampling rationale before selecting items. Include the material differences in site function, equipment family, criticality, remote access and support arrangements so the sample represents the estate rather than the nearest site. A sample drawn across the remote stations speaks for the remote stations, and the report states both the sample and the population outside it in plain terms.
Readiness evidence
Retain the request register, the interview notes with participants and dates, the source versions received, the missing item log and the agreed question list for the field visit. Before the visit the technical lead reads the notes once more to confirm that every interview statement is recorded as a statement and every tested fact as a tested fact.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), NIST SP 800-115, Technical Guide to Information Security Testing and Assessment (F03)
Safe work and stop authority
Water operations determine safe treatment, pressure, chemical dosing and discharge conditions. Every setpoint, dosing rate, alarm limit and controller mode stays in the hands of operations. These sentences are the operating rule for the entire engagement, and every member of the assessment team can repeat them from memory before the first site day.
Before connecting anything
Attend the operator's safety briefing and follow the site access, electrical, hazardous energy, confined space and other controls that the operator says apply. The operator determines which safety program governs, and electrical switching, confined space entry and plant permits stay with the qualified plant staff who hold those programs. Verify the asset owner, the permitted access point, the device approval, its malware screening, the cable path and the isolation design, and then attach the collection device. A mirror port or passive tap design can affect traffic handling, data exposure and network load, so its installation and its removal are both approved steps.
Define measurable stop conditions
Operations defines the baseline process indicators and limits appropriate to treatment, disinfection, pumping, storage, distribution, collection and effluent control. Record the conditions that require stopping in the operator's own terms: unexpected alarms, impaired communications, controller health changes, operator concern or any departure from the approved method. The number that matters is the one the operator watches. Name who can stop work and who can authorize resumption. Any technician may call a safety stop. The operating owner directs the plant response, and isolation, device resets and process restarts all happen at that owner's direction.
Record the stop and recovery
Log the time, the activity, the observed symptoms, the notifications made, the actions directed by operations and the restoration evidence. Preserve the available records alongside the safety response, which always comes first. Hold the activity permit while operations and the technical lead review the cause, then reauthorize the changed method and the remaining targets. A stop that is logged and reviewed is a mark of a controlled assessment, and the log is the record a later reviewer reads to confirm the assessment was run that way.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), NIST SP 800-115, Technical Guide to Information Security Testing and Assessment (F03), State Plans (F06)
Inventory and process dependencies
Build an inventory that explains how each asset supports treatment, disinfection, pumping, storage, distribution, collection and effluent control. An inventory ties each address to its function, and a passive discovery export joins it once it has been reconciled against the drawings.
Use existing evidence first
Reconcile the engineering inventories, configuration exports, approved drawings, maintenance records and supervised physical observation into one record. For each asset capture the identifier, function, location, owner, manufacturer, model, firmware or software version, support status, protocols, zone and recovery dependency. Mark each value as observed, taken from a configuration export, or supplied by a vendor or operator, because the three carry different weight and a reviewer will ask which one applies.
Trace the consequence
For each critical process trace the route from the operator interface and the control logic through communications to field equipment and the supporting services. Identify how an asset failure could contribute to loss of treatment control, unsafe chemical dosing, loss of distribution pressure, sewer overflow or impaired effluent monitoring. Ask engineering to validate the consequence and the available protection or manual alternative, then write down what they said and who said it. Record protective functions separately from normal process control and document the dependencies on identity, time sources, licensing, cloud support, third party communications and engineering tools. A safety function is recorded as independent when engineering has shown how it is isolated, whatever layer of the drawing it sits in.
Resolve discrepancies
Mark unidentified devices, duplicated identifiers, outdated drawings and vendor assets awaiting verification, and give each discrepancy to its owner to resolve. A system past vendor support gets its own control and recovery decision, and patching, scanning or replacing it during the assessment is an operating decision that operations approves. Expect the first reconciliation to surface undocumented engineering laptops, dual homed workstations and vendor modems; those are findings, and the inventory is where they belong.
Deliverable Review and Acceptance Criteria
The asset owner signs the scoped inventory and the dependency map. The report states the sources used, the collection date, the coverage achieved and every high consequence dependency still open. Sensitive addressing and configuration detail belong in the controlled technical appendix, and the management report carries the summary.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), A survey of cyber security management in industrial control systems (R01), Threat modeling of industrial control systems: A systematic literature review (R02)
Network paths and remote access
Review every path by which a person, a service or an external system can reach the scoped process. A firewall diagram is a hypothesis that the examiner tests against the rule base, the routing and the actual sessions, and that test is where a segmentation claim is confirmed or corrected.
Examine the intended boundary
Use dated configuration exports, rule bases, drawings and approved architecture records to identify the zones, conduits, remote entry points, jump services and management interfaces. For each material path record the source, the destination, the permitted service, the business purpose, the approver and the review date. Separate corporate identity, vendor support, telemetry, cloud management and emergency access into their own path records. Check whether access can be limited to named users and required assets, and whether it is reviewed, recorded and revoked. Examine an actual approval and an actual revocation from the period rather than the policy that describes them.
Examine the actual access process
Observe a supervised, approved support session or review the retained session records. Record how the user authenticated, how authorization was granted, who owns the account, whether the session was visible to operations, what constraints apply to shared accounts and how timeout and revocation behave. Where an installed controller supports a narrower mechanism, evaluate the controls at an approved access gateway and say so in the finding. The examiner looks closely at three common points: a vendor tunnel that bypasses the jump host, a rule base with permit any entries left from commissioning, and a dual homed engineering workstation that joins two zones the drawing shows as separate.
Match each claim to its method
A configuration review identifies an allowed policy path, and a controlled connectivity check, a separate authorized activity with its own permit, tests whether the path is reachable. A proposed segmentation improvement moves from recommendation to verified as it is implemented and tested, and the report uses those three words, allowed, reachable and verified, with their distinct meanings.
Required records
Retain the approved path register, the source versions examined, the access samples, the exceptions and the method used. If ISA/IEC 62443 is contractual, a conformity statement is made against the licensed edition and the agreed assessment criteria. The publicly described zone and conduit approach is a design method, and the assessment uses it to read the architecture.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), ISA/IEC 62443 Series of Standards (F08)
Accounts, legacy systems and suppliers
Start with the access needed to operate and recover the process, then identify the controls the installed system can actually support and the protections applied around it. Legacy equipment is assessed on the compensating controls around it, measured against what the installed system can support.
Accounts and authorization
Review named users, service accounts, vendor accounts and emergency credentials through approved exports of the identity directory, the local account stores on controllers and HMIs, and the vendor access platform. Verify owners, privileges, approval, periodic review and the revocation evidence for people who have left. Review how privileged access is separated from normal user activity. Record account names and roles. For every shared or embedded account document the technical constraint, the compensating controls, who knows the credential, how its use is supervised and logged, how access is removed when people leave and what change would reduce reliance on it. A shared operator account still on its commissioning password is common, and a well run site has the compensating controls around it written down and working.
Support and vulnerability decisions
Match versions and support status to vendor advisories using approved evidence. Separate a version match, a suspected vulnerability and a validated condition, and keep them separate in the finding register. When a controller answers a scan slowly, the team pauses and reviews the scan plan. For a legacy device compare patch availability, vendor support, maintenance dependencies, network exposure, replacement lead time and restoration options. The assessment recommends a decision. Operations and engineering approve changes under their own change process.
Supplier obligations
Review the supplier contracts for remote access, notification, vulnerability handling, evidence availability, subcontracting, licensing and exit support, and compare the paper to the observed practice. Identify contract promises that practice has yet to match and dependencies awaiting a named owner. Include a supplier contact and an escalation alternate in the operating handover so the operator reaches support during an incident in one call.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), ISA/IEC 62443 Series of Standards (F08)
Monitoring, time and evidence handling
Establish whether the available records can answer who accessed what, when, through which path and with what effect. Record time offsets as found, leave production clocks as they run, and translate timestamps in the analysis.
Collect a usable record
Identify the event sources, the collection routes, the retention settings, the access restrictions and the review responsibility for each. Include the jump host, authentication, firewall, engineering workstation and system records relevant to the scoped process. Verify that a small authorized event sample actually appears at the intended collection point, because the collection point itself is where the examiner confirms what was received last month. Record the time zone, the clock source, the observed offset and the coverage periods for each source. If clocks disagree, preserve the original timestamps and document the translation used in analysis. An absent event is checked against collection coverage before it is read as inactivity, and the report records which reading the evidence supports.
Evidence integrity
Assign each item a stable evidence identifier and record its origin, custodian, collection date and method, source period, filename or record reference, integrity value where appropriate, storage location and access history. Keep originals protected and conduct analysis on controlled working copies. Log every transformation and redaction. This is the discipline that lets a finding survive challenge from a vendor, a regulator or the other side in a dispute, and it costs minutes at collection time against hours of argument later.
Sensitive information
Have the compliance owner classify customer information, engineering records and any SSI, CEII, CUI or protected public records before collection begins, and apply the handling rules that actually attach to each class.
Deliverable Review and Acceptance Criteria
The custodian verifies access, recoverability and retention against the applicable instrument or the agreed contract. Preserve incident records and any legal hold independently of the normal assessment deletion date.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), NIST SP 800-115, Technical Guide to Information Security Testing and Assessment (F03), NIST SP 800-61 Rev. 3, Incident Response Recommendations and Considerations for Cybersecurity Risk Management (F04)
Recovery and continuity evidence
Check whether the operator can restore the process after loss of PLCs and RTUs, SCADA servers, HMIs, engineering stations, dosing controllers, telemetry, remote pump stations, laboratory interfaces and vendor connections. A successful backup job records that a file was written, and a representative restore is where recovery is demonstrated.
Define the restoration objective
Ask operations to identify the minimum service, the safe process condition, the restoration sequence and the maximum tolerable interruption. Record the chosen recovery objectives, their owner and the evidence that supports their feasibility.
Examine recovery dependencies
Identify the controller and server configurations, engineering projects, firmware, software, licenses, keys held in controlled storage, approved hardware, spare components and vendor support that a restoration needs. Confirm where a clean engineering station and trusted installation media are kept for an incident, and whether the engineering software has a copy apart from the workstation an attacker would target. Review backup isolation, access, integrity checks and the evidence of a representative restore. A production controller upload, download or failover is a separately approved activity, and an isolated or representative system carries the work wherever operations judge production unsuitable.
Exercise and validate
Use a scenario that removes a material dependency. Record which recovery steps were discussed, which were demonstrated in a representative environment and which were performed in production under approval. Document the differences between the test environment and the installed system. A tabletop exercise demonstrates a decision process, a technical restore is demonstrated on its own, and the report keeps the two distinct.
Closure evidence
Retain the recovery procedure version, the scenario, the approvals, the result, the elapsed time where it was actually measured, the open dependencies and the corrective owner. Operations accepts the restored state. Assumptions awaiting a test stay explicit in the report and are scheduled in the recurring program.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), NIST SP 800-61 Rev. 3, Incident Response Recommendations and Considerations for Cybersecurity Risk Management (F04), ICSSIM: A framework for building industrial control systems security testbeds (R03)
Authorization for active validation
Active validation enters the work when a controlling requirement or the agreed scope calls for it and an acceptable method has been authorized. A contractual requirement to test is met with a safe operating method, written down by the assessor before the work runs.
Write an activity permit
Identify the exact targets, the system owner, the purpose, the tool and its version, the commands or test functions, the allowed traffic behavior, the exclusions, the operating window and the collection location. Include vendor restrictions, communications arrangements, recovery support and the evidence to retain. Approve the method for the installed firmware and configuration rather than for a similar laboratory device, because controllers of the same model and different firmware behave differently under the same probe.
Choose the least disruptive evidence
Consider configuration examination, supervised control demonstration, existing logs and validation in a representative environment before any production probe. Record which requirement each method addresses and what it shows. Peer reviewed testbed research helps explain test design.
Confirm readiness at the point of work
Operations confirms the process condition and the baseline indicators. The technical lead confirms the approved tool settings and targets. The evidence custodian confirms that recording is running. The project manager verifies that the authorization is current and that the named stop authority is reachable by a channel that has been tested that day. Each of those is a separate activity with its own method, environment and approval.
Close the permit
Record the start and end times, the targets actually reached, deviations, stops, observations and the operating owner's acceptance. Revoke temporary access and remove approved collection equipment under the agreed procedure. Keep the original permit and the test record linked to every finding that relied on them.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), NIST SP 800-115, Technical Guide to Information Security Testing and Assessment (F03), ICSSIM: A framework for building industrial control systems security testbeds (R03)
Writing findings that can be audited
A finding shows the condition, its evidence, the criterion it was measured against and its significance for the process. Observed facts and possible operating consequences are kept in separate sentences, because a reviewer gives each its proper weight when the two are kept apart.
Minimum finding record
Record the finding identifier, the asset or control boundary, the evidence identifiers with dates, the requirement or agreed criterion, the observed condition, the method and what it covers. Explain the credible operating consequence and the assumptions behind it. Record the existing safeguards, the recommended action, the responsible owner and the proposed verification method.
Use precise status
Use Observed when the available evidence establishes a condition, and Suspected or Unresolved when the evidence points to a condition the examination has yet to confirm. Record recommendation, implementation and verification as three separate states. A screenshot of a changed configuration supports implementation.
Prioritize consequence and confidence
Evaluate the potential effects on treatment, disinfection, pumping, storage, distribution, collection and effluent control, the exposure paths, the existing safeguards, the recovery capacity and the confidence in the evidence. Include loss of treatment control, unsafe chemical dosing, loss of distribution pressure, sewer overflow or impaired effluent monitoring where the process supports that consequence, and have engineering review the pathway before it is presented as fact. A CVSS score describes a software vulnerability, and plant risk comes from the organization's own risk method: record that method and its acceptance authority, and keep the plant score grounded in it rather than in multiplied numbers.
Resolve challenge
Give the operating owner a documented opportunity to identify asset facts to correct, safeguards to add and remediation proposals to revise for safety. Retain the challenge, the additional evidence, the reviewer's decision and the revised wording. A disagreement closes when the record shows how it was resolved, whatever the report delivery date.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), A survey of cyber security management in industrial control systems (R01), Threat modeling of industrial control systems: A systematic literature review (R02)
Corrective work and management reporting
The assessment ends with decisions an owner can implement and a reviewer can verify. A corrective plan puts the vulnerabilities into an operating sequence, which is what turns a scan export into work an owner can schedule.
Plan the work
For each accepted finding identify the owner, the dependency, the required design or procurement, the change approval, the maintenance window, the recovery support, the target date and the verification evidence. Identify an interim control where the final fix takes longer, and carry the Deferred label on a postponed action through to implementation. Sequence actions by operating consequence and dependency: an access boundary may need a maintained jump host, named accounts and supplier support in place before a legacy controller can be isolated, and applying fixes in that order keeps the operator supported through the next outage. Verify that each proposed change preserves emergency operation and recovery.
Report to leadership
Provide a concise operating risk summary, the most consequential open issues, the funding or outage decisions required, the affected services and the boundaries of the assessment. Show the remaining work and who may accept the residual risk. Confidential addressing and detailed weaknesses stay in the restricted appendix.
Report to technical owners
Provide enough evidence and context to reproduce each observation using the approved method. Identify configuration versions, the affected boundary, exceptions and the exact acceptance criteria for closure.
Regulatory conclusion
State the obligations actually assessed, with their versions, the facility scope, the sample and the dates, and list in their own section the requirements outside this assessment and those awaiting demonstration.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), NIST SP 800-115, Technical Guide to Information Security Testing and Assessment (F03)
Verification closure and recurring work
Close an action against the evidence defined when the finding was written. A management assertion, a purchase order or a completed ticket is the cue to schedule verification, and the verified control result comes from that check.
Verification procedure
The reviewer checks that the implementation evidence matches the approved change. Agree a safe validation method, compare the result with the acceptance criterion and retain the evidence. Record exceptions and state whether the result establishes design, implementation or operating effectiveness, because those are three different claims.
Evidence Handover and Chain of Custody Transfer
Return the current inventory, dependency map, control and finding register, activity permits, evidence index, operating procedures, supplier contacts and training record to the designated owners. Check that authorized staff can retrieve those records during an outage, when the corporate document system may be the thing that is down. Remove temporary access under the agreed change record and confirm the removal.
Recurring triggers
Schedule reviews from the actual instruments and the operational change cycle rather than from a calendar copied from another site. Trigger a new applicability review after an ownership or service change, a new state footprint, a contract change, a revised standard, a significant architecture change or a material incident. Confirm whether a statutory update or certification is required, then set the due date.
Final acceptance
The operating owner accepts the process condition and the handover. The technical reviewer signs the evidence based conclusions. The compliance owner approves the requirement mapping and the remaining legal questions. The sponsor records the funding and residual risk decisions. The project manager closes each deliverable as it meets those acceptance criteria, and the closure record names each person and date.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), NIST SP 800-115, Technical Guide to Information Security Testing and Assessment (F03), NIST SP 800-61 Rev. 3, Incident Response Recommendations and Considerations for Cybersecurity Risk Management (F04)
Facility and applicability worksheet
Complete one worksheet for each legal entity, facility and distinct regulatory boundary, and keep the source records in controlled storage. The worksheet is the index an auditor reads first, so every field points to a record that exists.
Evidentiary Record Fields
- Facility legal entity address and operating function
- Complete this field in the controlled editable workbook or fillable PDF.
- Ownership operator classification permits registration and contracts
- Complete this field in the controlled editable workbook or fillable PDF.
- Applicable instruments exact versions and source record IDs
- Complete this field in the controlled editable workbook or fillable PDF.
- Applicability decisions exceptions and unresolved questions
- Complete this field in the controlled editable workbook or fillable PDF.
- Operating technical compliance and project owners with alternates
- Complete this field in the controlled editable workbook or fillable PDF.
- Decision approvers dates next review and authority record
- Complete this field in the controlled editable workbook or fillable PDF.
Field activity authorization worksheet
The operating owner approves the activity before work begins. This worksheet records that permission.
Evidentiary Record Fields
- Activity purpose exact targets and asset owners
- Complete this field in the controlled editable workbook or fillable PDF.
- Method tool version permitted functions and excluded actions
- Complete this field in the controlled editable workbook or fillable PDF.
- Vendor constraints approved traffic behavior and operating baseline
- Complete this field in the controlled editable workbook or fillable PDF.
- Operating window communications and named stop authority
- Complete this field in the controlled editable workbook or fillable PDF.
- Recovery support safe response and resumption authority
- Complete this field in the controlled editable workbook or fillable PDF.
- Operating approval technical approval date and change record
- Complete this field in the controlled editable workbook or fillable PDF.
Evidence and finding worksheet
Record facts separately from possible consequences. Link the original evidence, preserve the source times and state the scope of each method, so a reviewer working from the record alone can reproduce the finding.
Evidentiary Record Fields
- Evidence ID source custodian period collection method and integrity
- Complete this field in the controlled editable workbook or fillable PDF.
- Observed condition and method used to establish it
- Complete this field in the controlled editable workbook or fillable PDF.
- Applicable requirement exact version and agreed assessment criterion
- Complete this field in the controlled editable workbook or fillable PDF.
- Operating consequence safeguards assumptions and evidence limits
- Complete this field in the controlled editable workbook or fillable PDF.
- Finding ID responsible owner priority rationale and challenge
- Complete this field in the controlled editable workbook or fillable PDF.
- Reviewer disposition date and linked technical record
- Complete this field in the controlled editable workbook or fillable PDF.
Corrective action and acceptance worksheet
Keep recommended, implemented and verified as three separate states with their own dates and evidence. Record the remaining risk and name the person authorized to accept it.
Evidentiary Record Fields
- Finding ID action owner dependencies and target date
- Complete this field in the controlled editable workbook or fillable PDF.
- Approved implementation change record and operating window
- Complete this field in the controlled editable workbook or fillable PDF.
- Verification criterion authorized method result and evidence IDs
- Complete this field in the controlled editable workbook or fillable PDF.
- Remaining limitations interim controls and residual risk decision
- Complete this field in the controlled editable workbook or fillable PDF.
- Operating acceptance compliance disposition and recurring review
- Complete this field in the controlled editable workbook or fillable PDF.
- Technical reviewer sponsor decision date and closure record
- Complete this field in the controlled editable workbook or fillable PDF.
Terms used in the planning records
| Term | Meaning in this pack |
|---|---|
| OT ICS and SCADA | Operational technology; industrial control systems; supervisory control and data acquisition. |
| PLC RTU HMI DCS SIS | Programmable logic controller; remote terminal unit; human machine interface; distributed control system; safety instrumented system. |
| RRA ERP and PWSID | Risk and resilience assessment; emergency response plan; public water system identifier. |
| BES CIP DER and EMS DMS | Bulk Electric System; Critical Infrastructure Protection; distributed energy resources; energy/distribution management system. |
| SSI CEII and CUI | Sensitive Security Information; Critical Energy/Electric Infrastructure Information under the applicable authority; Controlled Unclassified Information. Determine the actual handling regime. |
| CySO CISO and EHS | Cybersecurity Officer; Chief Information Security Officer; environment health and safety. |
| PHA MOC and CMMC | Process hazard analysis; management of change; Cybersecurity Maturity Model Certification. |
| Applicable and Unresolved | Applicable requires facility facts and a controlling instrument. Unresolved identifies a fact or authority still being gathered, and it keeps the row open on the register, distinct from Not applicable. |
Sources F01 to R03, federal guidance and peer reviewed research
F01 Guide to Operational Technology Security Revision 3
NIST. Final guidance. September 2023 final publication; chapters 4 through 6 and OT control tailoring.
F02 Guide to Operational Technology Security Revision 4
NIST. Draft guidance. September 21 2026 initial public draft. Revision 4 was released as an initial public draft on September 21, 2026, so Revision 3 remains the final baseline.
R01 A survey of cyber security management in industrial control systems
Knowles and colleagues in International Journal of Critical Infrastructure Protection. Peer reviewed research. Volume 9 June 2015 pages 52 to 80. Used for qualitative management context, with current law and effectiveness figures taken from the primary sources.
R02 Threat modeling of industrial control systems A systematic literature review
Computers and Security. Peer reviewed research. Volume 136 January 2024 article 103543. Supports structured threat modeling, which the assessment applies to the specific plant.
R03 ICSSIM A framework for building industrial control systems security testbeds
Computers in Industry. Peer reviewed research. Volume 148 June 2023 article 103906.
Sources: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security (F01), NIST SP 800-82 Rev. 4 initial public draft, Guide to Operational Technology (OT) Security (F02), A survey of cyber security management in industrial control systems (R01), Threat modeling of industrial control systems: A systematic literature review (R02), ICSSIM: A framework for building industrial control systems security testbeds (R03)
Sources F03 to W02, federal guidance and water and wastewater instruments
F03 Technical Guide to Information Security Testing and Assessment
NIST. Final guidance. Assessment planning and rules of engagement. Apply OT operating constraints.
F05 CIRCIA public rulemaking notice
CISA and Federal Register. Rulemaking record. 2026 notice referring to the proposed rule and further town halls. The CIRCIA final rule has been under review at the Office of Management and Budget since October 1, 2026; its reporting clocks begin on the effective date the Federal Register publishes, so check the Register when setting the calendar.
F09 Cybersecurity Resource Center
New York DFS. Agency implementation source. 23 NYCRR Part 500 covered entity scope. Covered entity status is decided under the Part 500 definition, which the register checks for each New York operator apart from its location.
W01 AWIA Section 2013 and SDWA Section 1433
EPA. Agency implementation guidance. Covered systems; RRA and ERP content; certification cycles.
W02 Certification of Risk and Resilience Assessments and Emergency Response Plans
EPA. Agency implementation guidance. Certification and secure retention of actual plans.
Sources: NIST SP 800-115, Technical Guide to Information Security Testing and Assessment (F03), CIRCIA public rulemaking notice (F05), Cybersecurity Resource Center (F09), AWIA Section 2013 and SDWA Section 1433 (W01), Certification of Risk and Resilience Assessments and Emergency Response Plans (W02)
Sources W03 to W05, water and wastewater instruments
W03 Emergency Response Plan Templates for Drinking Water and Wastewater
EPA. Agency guidance. Separate drinking water and wastewater templates. EPA identifies the wastewater template as voluntary under SDWA 1433.
W10 Wastewater cybersecurity resources and adopted rules
New York DEC. Agency implementation guidance. 6 NYCRR Parts 616 650 and 750; March 2026 adoption; reporting.
W11 Wastewater cybersecurity regulations compendium
New York DEC. Agency guidance. March 2026 compendium; POTW compliance dates and referenced documents.
W04 Cybersecurity for Water and Wastewater Facilities
Indiana IDEM. Agency implementation guidance. IC 13-18-16.5; covered facility types; 2026 assessments and incident reporting.
W05 Community Water and Sewerage System Cybersecurity
Maryland General Assembly. Current selected Environment 9-2705; over 3,300 customers for that section. Other Subtitle 27 duties and actual implementation each receive their own review.
Sources: Emergency Response Plan Templates for Drinking Water and Wastewater (W03), NYSDEC wastewater cybersecurity resources (W10), Wastewater cybersecurity regulations compendium (W11), IDEM Cybersecurity for Water and Wastewater Facilities (W04), Maryland Environment 9-2705, current selected codified text (W05)
Sources W06 to S25, water and wastewater instruments and state authorities
W06 Guidance on Senate Bill 871
Maryland MDE. May 2026 SB871 implementation guidance, sections 3-9 and Attachments 1-2. Secure submission instructions now exist. Attachment 2 uses people instead of statutory customers; confirm current provider timing and scope with MDE.
W07 Water Quality Accountability Act
New Jersey DEP. Agency implementation guidance. Cybersecurity plans; annual assessment; scope over 500 service connections. Read alongside chapter law W08.
W08 Water cybersecurity amendments
New Jersey Legislature. Enacted chapter law. P.L. 2021, c. 262 and N.J.S.A. 58:31-4.1.
W09 New York drinking water cybersecurity applicability
New York DOH. Current rule page. 10 NYCRR Appendix 5-E.1; Subpart 5-1.33. The January 1 2027 transition and immediate training/reporting exceptions appear in the Department of Health rule summary; facility signoff is made against the full rule text.
S25 Missouri selected authority
Missouri Legislature. Selected enacted sector law. Selected state authority and applicability, reviewed October 16, 2026.
Sources: MDE SB871 implementation guidance, May 2026 (W06), NJDEP Water Quality Accountability Act (W07), Water cybersecurity amendments (W08), New York drinking water cybersecurity applicability (W09), RSMo 640.142 (S25)
Sources S29 to F08, federal guidance and state authorities
S29 New Hampshire selected authority
New Hampshire Legislature. Enacted sector law. Selected state authority and applicability, reviewed October 16, 2026.
NH WW Wastewater cybersecurity protection program
New Hampshire Legislature. Enacted sector law. RSA 485-A:5-f; current codified text.
F04 Incident Response Recommendations and Considerations Revision 3
NIST. Final guidance. April 2025 final publication.
F06 State Plans
OSHA. Jurisdiction directory. State and federal occupational safety jurisdiction. Check public employee coverage and industry exceptions for the actual workplace.
F08 ISA/IEC 62443 Series of Standards
ISA. Standards publisher overview. Published series and applicable parts. The normative texts are licensed from ISA and IEC, and a conformity or security level claim is made against the licensed edition the organization holds.
Sources: N.H. RSA 485:3-e (S29), NH-WW Wastewater cybersecurity protection program, NIST SP 800-61 Rev. 3, Incident Response Recommendations and Considerations for Cybersecurity Risk Management (F04), State Plans (F06), ISA/IEC 62443 Series of Standards (F08)